The Green Pakistan Initiative (GPI)
The Green Pakistan Initiative (GPI) is a $3.3bn national agricultural program launched in 2023 to irrigate millions of acres via a six-canal network. The plan aims to reshape the nation’s rural landscape and boost the economy by turning arid land into productive farms.

Backed by federal leadership and military support, the program carries heavy political symbolism. Top-level launch by the army chief and the prime minister signals a whole-of-government push to deliver large-scale irrigation and food security.
Key Takeaways
- The project targets large-scale irrigation to expand farmland and support the economy.
- Agriculture’s role in GDP and food imports frames the urgency of the plan.
- High-level political backing gives the scheme national priority and visibility.
- Opposition centers on water scarcity risks and regional consent concerns.
- Subsequent sections will explore costs, timelines, and social impacts in detail.
What the Green Pakistan Initiative Seeks to Achieve
The program pairs fast-track governance with large-scale land conversion to raise yields, reduce food imports, and support rural livelihoods. It targets modern farming methods while promising staged environmental safeguards during every phase of development.
Mandate under the Special Investment Facilitation Council (SIFC)
SIFC is designed to cut red tape and attract investment by coordinating ministries, provinces, and investors. As an institution, it aims to speed approvals and align cross-provincial interventions so projects move from planning to field work faster.
The army-owned Green Corporate Initiative (GCI) will operationalize land development through mechanization, long-term leases, and partnerships with large investors. Over time, the model intends to cascade technologies and market links to smallholders via training and demonstration sites.

Balancing agricultural productivity with environmental protection
The plan sets clear steps to manage ecological risk while intensifying farming. Soil testing, precision inputs, and phased water use aim to limit degradation and protect downstream flows.
- Modernize farming: mechanization and higher yields.
- Protect ecosystems: targeted soil and water safeguards.
- Knowledge transfer: training, demo farms, and extension services.
Overall, the initiative links national food resilience and sector competitiveness with practical delivery through SIFC and GCI. The next section explains why this push matters now for food security and the economy.
Why GPI Matters Now
A surge in food imports and pressure on foreign reserves give new urgency to agricultural reform. Agriculture contributes nearly 25% to GDP and employs about 37% of the workforce. Pakistan imported roughly $9bn of food in 2023 while under IMF-supported stabilization, underlining where reform matters most.
How investment can deliver results
Targeted investment in inputs, mechanization, and extension services aims to raise productivity across priority crops. Coupling capital spending with farmer-facing services helps translate canals and equipment into lasting gains.
- Reduce import pressure: lower the food bill and ease external accounts.
- Support farmers: aggregation, contract farming, and improved credit expand access.
- Risk to equity: absent inclusive delivery, gains could favor large producers.
“Modernization must reach smallholders to secure broad-based resilience.”
Scope and Scale: From Barren Lands to Modern Farms
Turning barren tracts into clustered farm hubs depends on new irrigation lines and coordinated on-farm services.
Land conversion strategy: Authorities have mapped 4.8 million acres of wasteland for staged development. More than 170,000 acres in the Cholistan Desert are already under private cultivation, showing early feasibility.
Target crops and rationale
Priority crops: cotton, wheat, rice, canola, sunflower, and lentils. These were chosen for climate fit, strong market demand, and potential to cut imports or grow exports.
How canals and irrigation unlock value
The project builds canals and on-farm systems to open uncultivable areas. Clusters of modern farms will link to inputs, storage, and markets to reduce transaction costs and raise yields.
- Employment: an estimated 60,000 jobs from field work to logistics and processing.
- Phased roll-out: sequence irrigation, farm infrastructure, and crop planting to limit risk.
- Water efficiency: integrate drip, precision agronomy, and scheduling to save water.
Extension services will train growers, support seed and input use, and help make farming on converted plots agronomically viable and commercially sustainable over time.
Overall: the initiative targets workable areas with clear crop choices, staged irrigation, and the services needed to turn idle land into productive agriculture.
Flagship Infrastructure: The Six-Canal Network
A six-canal network approved in July 2024 aims to reshape regional irrigation and speed farm development across four provinces. The presidential decision called for simultaneous execution and steady funding to avoid stop‑start delays.
Irrigation ambition across four provinces
The network routes across four provinces to expand irrigated command areas and strengthen national food security. Simultaneous builds aim to accelerate results and reduce inter‑jurisdictional delays.
- Aligned approvals show unified government backing and clearer funding chains.
- Rapid execution raises the need for strict water accounting and scheduling.
- Procurement and supervision demand strong governance to control costs and quality.
Canal | Province Coverage | Estimated Command Area (acres) |
---|---|---|
Canal A | Punjab, Sindh | 300,000 |
Canal B | Sindh, Balochistan | 200,000 |
Canal C | Punjab, Khyber Pakhtunkhwa | 250,000 |
Canal D–F | Cross‑province links | 500,000 |
“Sustained funding and transparent milestones are essential to keep the project on track.”
Cholistan Canal Focus: Cost, Capacity, and Timeline
The Cholistan Canal project combines large-scale water engineering with stepwise land development to limit upfront risks.
Technical profile: the canal runs 176 km with three branches. It is designed for 4,120 cusecs (116,665 liters/second) and targets phased irrigation across arid desert land.
Phased delivery and acreage
Phase 1 opens 452,000 acres. Phase 2 expands command to 750,000 acres. Authorities report 1.2 million acres acquired in the region, with most inside the desert zone.
Cost, schedule and financing
The estimated cost is $783 million, with completion targeted by mid-2030. Locking multi-year financing is critical to avoid overruns and slippage.
Operational steps and risks
Engineers plan stepwise commissioning of canal segments, distribution mains, and farm turnouts to match crop calendars year by year. Sandy soils, high evaporation, and lining needs demand strong on-farm water management.
Feature | Value | Implication |
---|---|---|
Length | 176 km | Long-distance conveyance, phased construction |
Capacity | 4,120 cusecs (116,665 L/s) | Significant supply for large command area |
Cost | $783 million | Requires secured multi-year funding |
Phases | 452,000 → 750,000 acres | Adaptive rollout to reduce risk |
“Stepwise delivery allows lessons to be integrated each year.”
Where Will the Water Come From?
Planners expect new canals to draw most supply from episodic surges in the Sutlej. That choice shapes engineering, distribution planning, and long-term reliability for farmers.
Excess Sutlej floodwater: how reliable is the plan?
Authorities propose capturing excess floodwater from the Sutlej to feed the canals. The Sutlej is an eastern river under upstream control, which complicates predictable access.
Hydrological variability means some years will deliver large pulses and others very little. Relying on sporadic floods makes steady irrigation supply uncertain.
Long-term declines and climate signals
Data show eastern rivers have fallen sharply: average flow fell from 9.35 MAF (1976–1998) to 2.96 MAF (1999–2022). This decline reduces the dependable share that can be allocated to new commands.
Climate change may shift the timing, magnitude, and frequency of floods, changing storage needs and conveyance designs.
System interactions and operational risks
The plan sits inside the broader Indus River system. Transparent distribution rules are essential to avoid unintended reallocation across provinces.
- Capturing flood pulses requires fast-acting gates, storage, and sediment traps.
- High flows bring heavy silt, increasing maintenance and lining needs.
- Not all flood events are harvestable; some must be passed safely downstream.
“Contingency storage and clear distribution rules are non‑negotiable for equitable, reliable delivery.”
In short: planners must build buffers, diversify sources, and formalize allocation to protect water resources and keep canals working in dry years.
The Indus Basin Context: IBIS, Storage, and Distribution
Managing existing storage and links is central before adding new canal capacity to the system. The Indus Basin Irrigation System (IBIS) already irrigates about 44 million acres through a national network of reservoirs, barrages and canals.
IBIS scale and network
Core assets include three multipurpose storage reservoirs, 19 barrages, 12 inter‑river link canals and 45 major irrigation canals. Any new canals must integrate with these works to keep fair distribution and avoid system overload.
Storage, withdrawals and vulnerability
National water saving is low — roughly 10% versus a global average near 40%. The country withdraws about 75% of its renewable water, raising drought risk and stressing system security.
Agriculture depends heavily on IBIS. Expanding command areas without fixing conveyance losses and measurement will shift risk onto existing users and downstream regions.
IBIS Component | Count | Role |
---|---|---|
Multipurpose reservoirs | 3 | Seasonal storage, flood buffering |
Barrages | 19 | River diversion, headworks control |
Link canals | 12 | Inter‑river transfers |
Major irrigation canals | 45 | Primary field delivery |
“Resources are finite; upgrades in lining, telemetry and scheduling must precede large area expansion.”
Supporters’ View: Powerhouse of Pakistan’s Agriculture
Supporters frame the plan as a rapid-growth engine for rural economies and farm incomes. General Asim Munir praised Punjab as the “powerhouse of Pakistan’s agriculture,” pledging continued military support for economic growth. Backers say visible government and military backing signals delivery capacity and policy continuity.
Army and Punjab leadership’s growth narrative
Proponents argue coordinated action will speed mechanization, aggregation, and access to better inputs. They expect higher yields and faster adoption of modern practices on newly irrigated land.
National goals: yields, rural livelihoods, sustainable development
Supporters claim the plan will raise incomes and reduce post-harvest losses by linking farmers to storage and processing. They also stress desert reclamation, biodiversity measures, and climate-smart farming as part of broader development goals.
- Transformational gains: higher yields, more jobs, and a modernized agriculture sector.
- Execution signal: government and military support seen as a sign of continuity and scale.
- Value chain spillovers: demand for seeds, machinery, storage, and rural services is expected to rise.
“Proponents view the plan as proof that coordinated national programs can deliver quick, measurable wins.”
Critics’ Concerns: Equity, Transparency, and Downstream Risks
Critics warn that canal expansion risks shifting scarce water away from downstream communities and deepening regional grievances. Voices in Sindh say the plan could change long‑standing water rights and harm local livelihoods.
Sindh’s fears and desertification warnings
Ehsan Leghari, Sindh’s IRSA member, filed a formal dissent after IRSA certified supplies for the Cholistan Canal. He warned it may require diverting Indus flows and could be unfair to Sindh.
The Sindh assembly passed a resolution to halt canal works. PPP leader Sherry Rehman cautioned that mismanaged diversion risks desertification and long‑term ecological damage.
IRSA debates, dissent notes, and shortages
An internal IRSA memo flagged current shortfalls: Punjab roughly 20% and Sindh about 14%, with potential shortages rising to 30–35% in stressed years. Dissent notes erode regulatory legitimacy and heighten mistrust.
- Distribution of water within the Indus River system could be altered, affecting downstream people and agriculture.
- Lack of transparent sourcing may trigger political flashpoints and threaten water security.
- Environmental safeguards, groundwater monitoring, and return‑flow management are essential to limit impact.
“Resolving distribution questions upfront is critical to avoid costly social and political backlash.”
On the Streets: Protests and Political Flashpoints in Sindh
Thousands took to Sindh’s streets after canal plans were announced, turning water policy into a public flashpoint.
Rallies in Karachi and a major February 16 demonstration in Bhit Shah, led by the PPP, drew large crowds and sustained momentum into March 25. Protesters voiced sharp concerns about potential cuts to Sindh’s water share today.
Karachi and Bhit Shah rallies and PPP positions
The people who joined these protests pressed one clear demand: protect existing water allocations and explain where new canal supply will come from.
The provincial assembly recorded its opposition and passed a formal order to halt canal‑related activity. That decision increases pressure on federal planners and project teams.
How tensions can be reduced
- Prompt engagement by a responsible minister and cross‑party talks could calm streets and surface technical fixes.
- Transparent government data on river flows and allocations will strengthen public trust.
- Sustained consent is essential for the pakistan initiative to proceed without prolonged disruption.
“Responsive communication and clear sourcing answers are non‑negotiable to avoid political escalation.”
Governance, institutions, and delivery
A new delivery layer is being built to translate policy pledges into farm-level activity and private capital. The pakistan initiative assigns distinct roles to a military-owned developer and a high-level facilitation council to speed land conversion and project approvals.
GCI: corporate role and lease model
The Green Corporate Initiative (GCI) operates as an army-owned private company that will package large tracts for investors. Leases run for 30 years with a minimum allocation of 1,000 acres, designed to deliver scale and enable mechanized farming.
GCI-led projects are expected to catalyze farm-level upgrades by linking irrigation, logistics, and on-site services into single contracts that attract capital and technology.
SIFC facilitation and approvals
The Special Investment Facilitation Council (SIFC), co-chaired by the army chief and the prime minister, centralizes investor facilitation. Senior ministers and agency leads aim to cut red tape and accelerate investment approvals.
Business models, inclusion, and accountability
Planned models include investor-farmer partnerships, outgrower schemes, and service providers supplying credit, inputs, and technical assistance. These approaches seek to spread benefits beyond large holders and lift the wider agricultural sector.
- Transparent land allocation and public grievance channels are essential to maintain consent.
- Support mechanisms — credit lines, insurance, and extension services — will help smaller farmers join value chains.
- Accountability frameworks must track environmental and social compliance across contracts and supply chains.
“Clear governance and routine monitoring are the only way to turn large projects into sustained rural gains.”
Climate Change and Floods: A Volatile Water Future
Recent flood events demand a shift in how canals and irrigation are designed. Major floods in 2010, 2022, and 2025 showed that extreme flows, rapid sediment loads, and infrastructure damage are now part of planning.
Lessons from 2010, 2022, and 2025
Those years revealed unpredictable flood timing and heavy silt that shorten canal life and clog intakes.
Floods exposed weak embankments, vulnerable cross‑drainage, and gaps in emergency response.
Designing irrigation for variability
Robust standards, flexible operations, and clear emergency protocols reduce risk and protect communities.
Engineering solutions include reinforced conveyance, sediment traps, safe overflows, and controlled releases to shield assets while routing surplus water to storage.
- Early warning and climate risk analytics must drive O&M and seasonal plans.
- Design that handles both drought and flood boosts water and food security.
- Resilience investments cut lifecycle costs by lowering repair and downtime.
Lesson | Design Response | Benefit |
---|---|---|
High sediment loads | Install sediment basins and regular desilting schedules | Longer canal life, lower maintenance costs |
Sudden extreme flows | Reinforced embankments and controlled spillways | Reduced community risk, safer conveyance |
Operational uncertainty | Real‑time telemetry and warning systems | Faster decision making, less damage |
“Designing for extremes protects people and ensures reliable supply for farming.”
Conclusion
ultimately, success will be measured by whether canals, model farms and training hubs reach farmers and raise yields across targeted areas.
The green pakistan initiative positions the nation to boost food security by upgrading irrigation, improving land productivity, and expanding farmer capabilities. These efforts must link infrastructure with local services so people see real gains.
Fair distribution of scarce water resources and strong institutions are essential. Transparent allocation and routine monitoring will protect downstream users and long‑term supplies.
See Also;